Tuesday, December 28, 2010

Wade Porcelain Viking

Scrap Christmas Break

To lower the turkey, white sausage, oysters, foie gras, chestnuts, the log, chocolates, (no, I'm gloating ...), nothing like a little exercise to hammer ...

suite bathroom with this kind of scaffolding that I often use: a piece of wooden ladder, a stepladder and a good board. Easy to move, stable, height adjustable, cheap (only requirement: have a piece of wall to support the scale, otherwise ...)! Reassure we also use mason trestles and battens for larger rooms.





The very annoying little thing in this case: the top of the walls there is a cantilever beam so that the coating adheres well to the mason had been nailed against the fence wood. It's very difficult to remove and more (if you have followed) is high! The most effective: a flat chisel mounted on the breaker.




State of the bathroom, 8 wheelbarrows of rubble later.


the absence of Father Christmas, who was passing by Terminator ...


More than 12,624 wheelbarrows ...

Wednesday, December 22, 2010

Error 5010 Canon Mp145








Sunday, December 19, 2010

Free Clips Brazilian Wax

Bibi? Wadding

Not much activity at home this weekend for the little guys back home!

Just a trip cellulose. Thirty Nerds are in the house (including 3 already installed). He probably missed a few.

For those interested in this product, it is therefore the fine flock of Homatherm I paid € 14.72 HT bag.



The work will resume after Christmas (a holiday week) ... Following the wadding and the bathroom are on the agenda.


A photo hot out of the animal (pre-history) of the wildest of the planet: Ficellus Maximus ... Do not get too close to the picture please ...


Sunday, December 12, 2010

Early Pregnancy And Nipple Changes



Loading wadding to start the day: 17 bales. I will make a second trip next week.




With the technique bin + paint mixer, it takes 20 minutes to unpack a bag (see details in the article of June 2010: wadding and breaks.)
Two, with two garbage service, you must do 3 bags per hour without rushing. A few hours here and there and we should come to the end (about thirty bags in total).
With Mary, we have "blown" 3 bags of history fill the first box.
As expected
a box contains 2.5 sacks which is a density of 35 to 37 kg per m3.




result next summer. We hope to have less hot in the rooms beneath the attic ... Maybe even have a little less cold weekend of spring.


Still no plumber to shut off the water in the bathroom, but I've started to break the coating. As was the case almost everywhere in the house, there are 5 to 7 cm of cement well beefy.
I had already forgotten how hard this job is and how wheelbarrows of rubble fill up quickly!







I recycle blue tiles intact ... If you wonder? To make a contest trivet very ugly example!

Sunday, December 5, 2010

Letters To A Committee For Continued Employment

Hangar

Saturday, discovery of the land under the snow and the sun.

Visit a carpenter, roofer to estimate the cost of moving the shed.
Indeed this shed is in extension of the barn but we are determined to change places, if only to put the barn in value. Properly re-roofing, to be as much to move the monument.
He does the same width as the barn (9 m) long and 15 m (5 rows of 3 m). It is entirely of wood. According to the expert, the framework (the firm) is in good condition and can move without problems. But it will probably change pits and rafters.
will be back towards the entrance, on flat ground (no excavation to be made), and facing south. It will serve primarily to store the wood, but the tractor and chickens.
We will recover the stones from the rear wall (the stone plateau in regular blocks) to a low wall on 3 sides of the shed (50 cm). Between the top of the wall and the roof is being considered wood siding.
Along south wall will of course remain open.

displacement could be done in 2011 (according to the maker) ... to see ... For the rest (low wall, siding) it will wait for retirement!


Today we already store the timber (bulk). It's a little area ... But it is convenient.


And wood, there has been: Rafters of the barn and house, beams, trees ...
For 9 years we carry out regular trailers wood for the stove of the present house (they never return empty). Here
beams (some) who argued that the prosecution was removed by Jacques and Freddy.


Considering the temperature, it warms to wood.

I still put the last board paneling in the room. Some concerns on this resin panels that should eliminate with turpentine. Unless there is another technique?





And the attic is now ready for batting: Let the fun begin!

We are still waiting the plumber, in case ...

Tuesday, November 30, 2010

Jan Mclean Dolls Ebay

The bright side tiles

Response Barthe home in the great game of tiles: A2, B1 and C1

Monique was right ... Who doubted?

I will continue to delve deeper because I'm sure I saw put in reverse. It was not ugly either! Re

here are the visible faces:








Convinced?

Saturday, November 27, 2010

Silver Fern Tattoo- Panga



This morning, for the window, it was found that:

Ten cm on the road.

As the house is 60 Km from the house now, we wisely stayed warm.

Short walk to the pond ...


With String trying to clear his nose (to 16 years, it remains playful!)



Well, this will work for later. Next Saturday, who knows?

Sunday, November 21, 2010

Bridal Shower Messages

Snow Every other day

Just a day at home after. This will probably like this in the coming weeks must be a break!

Saturday, then assembled BSO crib in the attic under the slates.
Each box is 1.70 mx 1.70 m except where they are double sided. Each element "base" is a little less than a m3 so should contain about thirty pounds of wool (or 2.5 bags). It remains
few things to finish, including the partial closure of fenestrous, before starting to apply the padding.
I did not have an opinion contrary to the use of cotton in the attic. It seems that in these conditions it well ventilated dry fast enough ... to follow.




End of the paneling in the room below. Finally, Almost, because it lacks a blade!
Yes, I know, I'd do better next time ....





Next week: the beginning of the break in the bathroom! Finished playing with Legos!

Monday, November 15, 2010

Is It Safe To Put Coke On Your Gums

From the attic bedroom

Mary had cleaned the attic under the slates. We continued by putting the mortar in some holes found between the masonry and roof.



then installing a steam-brake (sisalex 500) stuck with ampacoll (it, sticking). If you find that the tape is not sticky enough ordinary, look no further! But it is not given (40 € TTC roll).
To improve the seal between the floor and walls, we finally made a big cord mortar of lime and flax chaff, all around.



Finally, we cut sheets of OSB to make boxes that will receive the bulk of cellulose wadding. Thirty cm.
Thus, the three openings (we see one on the photo above) will be partially blocked but I think the ventilation of the attic and then the wadding is sufficient.
Question though: when we were doing these chores it was raining or drizzling (outside!), So the air was very humid in the attic ... Wadding it can withstand this treatment? the investigation is ongoing. Then

descent into the room on the ground floor to advance on the dubbing of the partition that separates this room from the bathroom.


Lathing vertical plates of 2 cm cork stuck, posing a rough paneling, wide, horizontal.
We will do the same on the other side of the partition (in the bathroom), but probably with a dado of another species (more suited to the humidity).
The partition will thus about 13 cm thick, 4 cm cork.



If we add some purchases of materials, an intense reflection on the electrical installation of the floor and some dismantling of the old installation, we will end the weekend.

With still a high quality restaurant to close all this (thank you Ginette!).


It is worth a couple worries!

Sunday, November 14, 2010

What Is The Story Behind The Cape Cod Bracelet

game tiles

Yep, I'm being a bit stupid (why a little?).

When I went Barthe, the little lady who showed me the different finishes took care to give me a floor tile in writing MVM back thereof. With it, no problem, I can locate the front and back.
Yes, but now I see two pallets of tiles to tidy the house, I doubt ...

So little game Three tiles (say A, B, C) photographed Duplex: Can you tell me what is the opposite that you would keep "on top"?

I warn you, it does have nothing to gain.

Tomette A1

Tomette A2


Tomette B1


Tomette B2

Tomette C1

Tomette C2

Advertising Nikon is completely free (although if Mr Nikon wants me to pay the tiles why not?)

Otherwise, four days after the house: report tomorrow!

Tuesday, November 9, 2010

Wkłady Do łóżka 140

How the city reinvents Does the car?

A note: A Geo-Cafe in Strasbourg on 18 November 2010 at 20h
Introduction by the organizer:
The place of the car is a central topic in debates on sustainable cities. Today, it's not just reduce the number of cars but also the extent of its use. There is currently a rapid development of urban mobility: the movement is now associated with service, the vehicle - car, bicycle - itself becomes a service rather than an object, information systems and real-time location-based change behavior, etc..

Sustainable mobility can hang it as a reinvention of car use in town? What place should I leave him and in what forms? What are the limitations of these developments?
Speakers: Anthony
BEYER, Professor of Geography at the University of Paris IV
Jean-Baptiste Schmider, Director of Auto'trement, cooperative car sharing
Source: Forum ecodistricts via Crévilles

Sunday, November 7, 2010

Smashbox Czy Make Up Forever

Small works

Mary cleaned the attic which is under the slates (about 50 m2). We will begin its isolation from the next weekend (4 days!).

Ben, and the tiles? After consulting

Monica, it turns out that it is not advisable to lay the tiles if the temperature is fall below 10 degrees. As the house will not be heated this winter, it is likely that we will regularly below 10 degrees. We will wait for spring to this site.


I started dubbing the only piece of wall that remained standing. This partition separates the room from the bathroom. I ask vertical battens. Between battens I stuck cork boards, 2 cm thick and cover the whole of rough boards or paneling. We plan to do the same side bathroom.


Apart from that, installation of electrical boxes for installation and cleaning beams that serve as the lintel to the scullery. It

tinker, tinker it ...